+ Storm sewer frame and cover adjustments and minor concrete curb repairs/in-fills
+ Sidewalk completion around the bridge structure, both sides
+ Installation of decorative patterned colour concrete splash pads (area between the back of curb and front of sidewalk), throughout
+ Masonry work on the gateway monument (see sketch)
+ Installation of decorative bridge pier caps at both structures
+ Decorative staining of both structures
+ Driveways paving
+ Final landscaping touch-ups: sod/seed and shrubs; and
+ Placement of top asphalt and permanent durable thermoplastic line markings
The intention is to complete the project by mid-June or sooner, weather permitting
+ Remove both site trailers in front of Alton Pumping Station
Commence concrete works (curbs, sidewalks and splash pads)
+ Commence gateway monument works
Please note that temporary lane closures are expected between 07:00AM and 5:00PM, Monday to Friday in order to complete outstanding boulevard works
Please note that the Region of Peel retained a facilities contractor to complete improvements to Alton Pumping Station. In the next few weeks, you will see additional construction activities in and around the Station. Most of the work will occur inside the Station. Should you have any questions pertaining to that project, please contact Jennifer Lanthier, Project Manager, Water Facilities Engineering & Reliability at [email protected].